drainage worker
Drainage workers assemble and maintain drainage and dewatering systems. They lay tubes or drainpipes to dry out the ground of a certain structure in order to put a hold to imminent groundwater. This work is usually performed under pavements and in basements.
Also called: groundwater drainage worker, drainage system installer, drainage groundworker, drainage pipe layer, drainage installer, deep drainage operative, deep drainage worker, pipelayer
- 19
- essential skills
- 20
- optional skills
- 8
- related roles
- 9312
- ISCO-08 group
Where you can go from here
8 rolesOccupations sharing the most essential skills with this one. The number is a count, not an opinion.
- sewer construction worker9 skills in common
- sewerage maintenance technician7 skills in common
- civil engineering worker6 skills in common
- pipe welder6 skills in common
- water network operative6 skills in common
- rail layer5 skills in common
- sewer construction supervisor5 skills in common
- sewerage network operative5 skills in common
Essential skills
19- assemble manufactured pipeline parts
- clear pipelines
- create open drainage systems
- detect flaws in pipeline infrastructure
- follow health and safety procedures in construction
- inspect construction supplies
- inspect drainage channels
- inspect pipelines
- inspect sewers
- keep airport drainage systems functional
- manage sumps
- mechanical systems
- mechanics
- operate sumps
- perform drainage work
- prevent pipeline deterioration
- provide pipe bedding
- types of pipelines
- use safety equipment in construction
Optional skills
20- design drainage well systems
- dig soil mechanically
- ensure regulatory compliance in pipeline infrastructures
- excavation techniques
- health and safety hazards underground
- inspect construction sites
- install drainage well systems
- install PVC piping
- operate excavator
- operate GPS systems
- operate pumps
- operate vacuum dewatering system
- perform water analysis
- repair pipelines
- set up temporary construction site infrastructure
- test pipeline infrastructure operations
- transport pipes
- types of bedding materials
- use measurement instruments
- work in a construction team
No account needed to start
How close are you to being a drainage worker?
MyNodes reads your CV once, maps it to this same taxonomy, and shows you which roles you are already closest to and the few skills that would open the most doors. The file is deleted as soon as it has been read.